Negligence by the government and Tokyo Electric Power (TEPCO) contributed to the Fukushima nuclear disaster in March 2011, a court in Japan has ruled, saying the catastrophe could have been avoided, and marking the first time the state has been held liable.

The district court in Maebashi, north of Tokyo, said the government and plant operator were to blame for failing to prepare anti-tsunami measures.

he judge awarded a total of 38.55 million yen (US$340,000) in damages to some 62 plaintiffs who evacuated to Gunma Prefecture after the disaster began to loom large at the Fukushima No. 1 nuclear power plant in March 2011, the Asahi Shimbun newspaper reported.

A group of 137 plaintiffs had argued the authorities and TEPCO failed to prevent the triple meltdown at the plant, and demanded 11 million yen ($97,108) each in compensation, the newspaper said, adding that the court accepted most of the arguments about the dramatic lack of anti-tsunami measures.

The plaintiffs highlighted the fact that in May 2008, three years before the disaster, plant operator TEPCO received an estimate of a tsunami as high as 15.7 meters that could hit the Fukushima No. 1 nuclear plant, Asahi Shimbun reported. That apocalyptic forecast came true, with a wave around that height hitting the nuclear power plant in 2011, triggering the reactor meltdowns. A huge tsunami knocked out the Fukushima Daiichi nuclear plant, spewing radiation and forcing 160,000 people to flee their homes.

If the utility had installed emergency diesel electric generators on higher ground, the measure could have prevented the nuclear disaster, the court ruled on Friday.

The Rest…HERE